So you’ve decided to purchase a GLASHAUS. Here are the steps you need to follow to complete your purchase.

STEP 1 - SELECT YOUR GLASHAUS

Once you have selected your preferred GLASHAUS on the Generator you will receive a formal offer from us. This offer will include Full Design, Supply, and Installation. We will also provide all our own lifting equipment.

STEP 2 - SELECT A BUILDER

You will need to select a local builder to do the preparation work for your GLASHAUS. This is called ‘Builders Works’ and will include things like:

  • Foundations - a concrete slab foundation
  • Opening in the adjacent house wall and preparation of supports for the GLASHAUS
  • Underfloor heating
  • Electrics and wiring
  • Plastering and Finishing
  • Plus any other work you required

As part of our service GLASHAUS offer a pre-engineering service to help this process along. We will provide a set of drawings and specifications which can be sent to your preferred builder for them to prepare an accurate quotation. Please look at our service ‘Builders Works’. This service is offered at a minimal cost and will be refunded on the purchase of the GLASHAUS. These drawings can be used to acquire a planning permission.

STEP 3 – ORDER YOUR GLASHAUS

Once you are happy with your builders proposal, you can then finalise the purchase order with GLASHAUS. Within 14 days GLASHAUS will send a detailed set of drawings for approval which will determine the final size and confirm any options that have been chosen. You will need to send a copy of these drawings to your builder.

STEP 4 – ORDER CONFIRMATION

Once the drawings are approved, we will start manufacture of the GLASHAUS. We will inform you of the delivery date so that the builders works can be planned accordingly. Delivery time is 8-12 weeks.

Insulated Glass

STEP 5 – DELIVERY AND INSTALLATION


We will contact you to make sure there is sufficient space to deliver the GLASHAUS and then we will confirm a delivery and installation date. GLASHAUS will come and visit the site and will check that the builders works have been done according to the builders works drawings. There will be a single delivery to the site and we will offload the material ourselves. Installation will commence and will take 3-4 Days depending on the access.

STEP 6 – HANDOVER

Once we complete the GLASHAUS, the Builder will return to complete the finishes as required. We will check that the GLASHAUS is fully functional. This will be signed off on the handover sheet.